CHECKLIST

Comparing cabling quotes? 14 things every quote should state

Two quotes can look similar and deliver very different networks. Use this checklist to compare like with like, then print it or share it with your team.

In this guide
  1. The cable and the parts
  2. The scope
  3. Quality and handover
  4. After handover

Related guides

Two quotes side by side: one states every item, the other leaves several out
Two quotes can look similar and leave out very different things.

Put each quote next to this list and tick what it states clearly. A missing item is not always a bad sign, but it is always a question to ask before you sign.

The cable and the parts

  1. The cable category and type are written clearly, for example Cat6A U/UTP LSZH.Without it you cannot compare quotes or check what was installed.
  2. The cable is solid copper, not CCA (copper-clad aluminium).Many contractors do not make this clear. CCA does not meet the standards and is risky with PoE.
  3. All parts come from one manufacturer's system.Mixing parts can lower performance and can affect the system warranty.

The scope

  1. The number of points and their locations, according to the drawing.So nothing is missed and every point is where you need it.
  2. The pathways: trunking, conduits and cable trays.Pathways keep network cables separated from other sources of interference.
  3. The rack, patch panels and cable management inside the rack.A tidy rack makes maintenance, and adding or removing devices, much easier.
  4. What is not included: civil works, ceilings, electrical work and so on.So you know what you still need to arrange or pay for.

Quality and handover

  1. Every point is tested with a certification tester, and you receive the report.The report gives the details of every cable, and if there is a fault it shows where.
  2. Cables are labeled at both ends.Unclear labels make maintenance slow and difficult.
  3. As-built drawings are delivered at handover.You will need them for every future change or expansion.
  4. A schedule with clear delivery stages.So you can plan the move and your team around it.

After handover

  1. The warranty: how long, and who covers what (contractor and manufacturer).Know who to call, and for how long you are covered.
  2. Support after handover and the response time.After-sales service is one of the most important points for any client.
  3. The contractor's experience and similar projects.Ask to see work like yours.